Mosul Refinery, Iraq – Supply, Installation and Commissioning of Gas Filtration System

Mosul Refinery, Iraq

Supply, Installation and Commissioning of Gas Filtration System

Project introduction

This project included the design and material supply, installation, and commissioning of a gas filtration system at Mosul Power Plant in Iraq. The scope included the supply of magnetic filters, firefighting systems, instrumentation parts, piping works, and personnel training.
Achievements and results
  • Successfully commissioned the gas filtration system in accordance with project technical requirements.
  • Improved inlet gas quality and enhanced operational stability of the unit.
  • Delivered the project after performance testing and operator training.
Project challenges
  • Coordinating procurement, installation, and commissioning activities simultaneously.
  • Ensuring technical compliance during the installation of process and control equipment.
  • Training operators alongside final project handover.
Implementation solutions
  • Implemented phased planning for equipment procurement, installation, and commissioning.
  • Conducted performance tests and quality control checks prior to operation.
  • Transferred technical knowledge through practical training and technical documentation.

Key features of the project

Duration
0 Months
Service Areas
0
Lost-Time Incidents
0
On-Time Delivery
0 %

Subscribe to the newsletter

Iran International General Contracting Company (IGC) has nearly 30 years of experience in the oil, gas, power and petrochemical industries and has completed more than 60 major onshore and offshore projects (inside and outside Iran). It is ranked 1st by the Planning and Budget Organization and also has an E&P license from the Ministry of Oil. The company is also a leader in this field by implementing numerous successful EPC projects in the oil and gas industry.