



This project included the review and approval of the FEED package, detailed engineering, material supply, packaging, insurance, transportation, customs clearance, warehousing, storage and material protection, inspection of materials by an approved inspector, procurement of all equipment, tools, accessories, and materials required for construction and erection, obtaining the necessary insurance coverage, implementing required telecommunications facilities, performing fabrication, testing, installation, pre-commissioning, commissioning, and performance testing of facilities, ensuring acceptance of the works through all required tests and during the warranty period, supplying spare parts and special tools required for start-up and testing, and providing training services.
The project also covered EPC works for Lavan Refinery utility facilities and storage tanks, including 4×7 MW steam turbine generators, 14 storage tanks, 4 boilers, wastewater treatment facilities, MED desalination unit, potable water systems, and other related facilities.
Iran International General Contracting Company (IGC) has nearly 30 years of experience in the oil, gas, power and petrochemical industries and has completed more than 60 major onshore and offshore projects (inside and outside Iran). It is ranked 1st by the Planning and Budget Organization and also has an E&P license from the Ministry of Oil. The company is also a leader in this field by implementing numerous successful EPC projects in the oil and gas industry.
Designed and implemented by Jelveh Faraz Afarinesh