South Pars Phase 19, Asaluyeh – Civil Works, Equipment Installation, Fabrication and Pre-Commissioning

South Pars Phase 19, Asaluyeh

Civil Works, Equipment Installation, Fabrication and Pre-Commissioning

Project introduction

This project included installation, fabrication, equipment erection, execution of all related interfaces, pre-commissioning, commissioning support, material and equipment control, auxiliary warehouse services, loading, transportation and unloading at the site, heavy lifting, civil works, erection of mechanical and other facilities, site testing, field engineering, support for subcontractors and vendors, preparation of as-built drawings and technical documentation related to fabrication and pre-commissioning, final documentation, defect rectification during the warranty period, and temporary and final acceptance tests.

Achievements and results
  • Completed civil, installation, and pre-commissioning activities within the project scope.
  • Prepared the facilities for operational start-up.
  • Successfully executed activities in accordance with technical and contractual requirements.
Project challenges
  • Managing civil works, equipment installation, and pre-commissioning activities simultaneously.
  • Coordinating execution teams across different project areas.
  • Ensuring compliance with HSE and quality control requirements throughout all execution phases.
Implementation solutions
  • Implemented integrated planning between civil works and equipment installation activities.
  • Continuously monitored project progress and execution quality.
  • Maintained close coordination among execution, technical, and commissioning teams to accelerate project progress.

Key features of the project

Duration
0 Months
Service Areas
0
Lost-Time Incidents
0
On-Time Delivery
0 %

Subscribe to the newsletter

Iran International General Contracting Company (IGC) has nearly 30 years of experience in the oil, gas, power and petrochemical industries and has completed more than 60 major onshore and offshore projects (inside and outside Iran). It is ranked 1st by the Planning and Budget Organization and also has an E&P license from the Ministry of Oil. The company is also a leader in this field by implementing numerous successful EPC projects in the oil and gas industry.

Contact us