The project included the complete dismantling of Units 1 to 8, supply and major overhaul of fuel nozzles, caps and liners, transition pieces, first- and second-stage nozzles, first- and second-stage turbine blades, and first- and second-stage shroud assemblies. The scope also included the supply and rehabilitation of electrical and instrumentation equipment, including exhaust thermocouples, compressor discharge temperature thermocouples, fire detection sensors, damaged equipment with control cables, instrumentation mounted on the gas turbine frame, and other related equipment, followed by handover to the client for eight GE-F5 gas turbine units in accordance with project technical specifications and requirements.
Iran International General Contracting Company (IGC) has nearly 30 years of experience in the oil, gas, power and petrochemical industries and has completed more than 60 major onshore and offshore projects (inside and outside Iran). It is ranked 1st by the Planning and Budget Organization and also has an E&P license from the Ministry of Oil. The company is also a leader in this field by implementing numerous successful EPC projects in the oil and gas industry.
Designed and implemented by Jelveh Faraz Afarinesh