Project introduction

The project included material supply, replacement and installation of major components and hot gas path parts, electrical and instrumentation equipment, complete overhaul of two 25 MW GE-F5 gas turbine units, and personnel training at the Shuaiba Gas Power Plant in Iraq.

Achievements and results
  • Successfully completed the rehabilitation of Gas Turbine Units 1 and 2 in accordance with technical requirements.
  • Improved the reliability and operational readiness of the power generation units.
  • Delivered technical knowledge transfer and operator training during project execution.
Project challenges
  • Ensuring timely procurement of spare parts and maintenance equipment.
  • Coordinating maintenance activities with the power plant schedule.
  • Performing testing and quality control after equipment rehabilitation.
Implementation solutions
  • Implemented detailed planning for spare parts procurement and maintenance activities.
  • Conducted technical inspections and testing throughout all project phases.
  • Provided hands-on operator training alongside project execution.

Key features of the project

Duration
0 Months
Service Areas
0
Lost-Time Incidents
0
On-Time Delivery
0 %

Subscribe to the newsletter

Iran International General Contracting Company (IGC) has nearly 30 years of experience in the oil, gas, power and petrochemical industries and has completed more than 60 major onshore and offshore projects (inside and outside Iran). It is ranked 1st by the Planning and Budget Organization and also has an E&P license from the Ministry of Oil. The company is also a leader in this field by implementing numerous successful EPC projects in the oil and gas industry.

Contact us