Bandar Abbas Refinery – Installation of Mechanical Equipment, Auxiliary Facilities and Pumping Systems

Bandar Abbas Refinery

Installation of Mechanical Equipment, Auxiliary Facilities and Pumping Systems

Project introduction

This project involved the installation of mechanical equipment and auxiliary facilities for the Bandar Abbas pumping station to support the development of oil transmission infrastructure and enhance the operational capability of existing facilities. The project focused on construction and installation activities as part of IGC’s oil and gas project portfolio.

Our service range

Achievements and results
  • Successfully completed construction and installation activities in accordance with project requirements.
  • Prepared the facilities for safe operational service.
  • Ensured compliance with quality standards and execution requirements throughout the project.
Project challenges
  • Performing construction activities within an operational industrial environment.
  • Coordinating execution activities with equipment installation works.
  • Maintaining compliance with HSE and quality requirements throughout the project.
Implementation solutions
  • Implemented systematic planning for installation activities.
  • Continuously monitored the quality of execution works.
  • Maintained effective coordination between engineering and construction teams.

Key features of the project

Duration
0 Months
Service Areas
0
Lost-Time Incidents
0
On-Time Delivery
0 %

Subscribe to the newsletter

Iran International General Contracting Company (IGC) has nearly 30 years of experience in the oil, gas, power and petrochemical industries and has completed more than 60 major onshore and offshore projects (inside and outside Iran). It is ranked 1st by the Planning and Budget Organization and also has an E&P license from the Ministry of Oil. The company is also a leader in this field by implementing numerous successful EPC projects in the oil and gas industry.

Contact us